Phong Dien Solar Energy Power Plant
Project: Phong Dien Solar Energy Power Plant Capacity: 35 MW Location: Dien Loc Commune, Phong Dien District, Thua Thien Hue Province Investor: Gia Lai Electric JSC (GEC) Schedule: 8.5 Months (From February/2018) Main contractor: Sharp – SSSA – NSN Sub contractor: Construction Investment Joint Stock Company No. 5
Project: Phong Dien Solar Energy Power Plant
Capacity: 35 MW
Location: Dien Loc Commune, Phong Dien District, Thua Thien Hue Province
Investor: Gia Lai Electric JSC (GEC)
Schedule: 8.5 Months (From February/2018)
Main contractor: Sharp – SSSA – NSN
Sub contractor: Construction Investment Joint Stock Company No. 5